Paint Material supply and Construction painting for 02 Double Wall Tanks at Package A2, LSP

Công ty TNHH Heatco Việt Nam

Paint Material supply and Construction painting for 02 Double Wall Tanks at Package A2, LSP

Paint Material supply and Construction painting for 02 Double Wall Tanks at Package A2, LSP

In the A2 package of the LSP project, Heatco has carried out anti-corrosion painting work for 02 large double-wall tanks including TK-7350B (ID 66m, height 32.2m) and TK-7200 (ID 37.8m, height 28.8m). The investor is LSP and the general contractor is Posco, the main contractor Woongnam has trusted Heatco for this task to ensure the progress and quality of the tanks. With experience and modern technology, we ensure that the paint layer meets the highest technical requirements, increasing the life and safety of the project.