Heatco is proud to provide Post-Weld Heat Treatment using a temporary furnace, to maintain the durability and stability of the parts after welding. The process helps control the hardness of the material, minimize residual stress and prevent welding defects, brittle fractures, or the risk of cracking. This is an essential step in production to ensure the life of the welded parts to the highest standards.
Temporary Furnace Solution for Large Parts
For large-sized parts and tanks that conventional furnaces cannot meet, Heatco has developed a flexible temporary furnace installation solution that can easily adapt to any product scale. Thanks to modern equipment and deep expertise in PWHT techniques, we are committed to providing customers with the best heat treatment service at optimal cost.
Benefits of Post-Weld Heat Treatment Service
– Control material hardness: Ensure the parts after welding maintain ideal hardness and durability.
– Reduce residual stress: Helps increase flexibility and long-term durability for products.
– Prevent welding errors: Avoid brittle fracture problems and minimize the risk of cracking during use.
With Heatco’s temporary furnace PWHT method, customers can be completely assured of product quality, optimized in both technique and cost.